CeraSet CS-3 is a superior performance bagged cementitious tile adhesive to install tiles and natural stone using the thin-set method of installation.To be used with clean water only . For improved performance & tile over tile fixing mix with CS-TA .CS-3 is available in grey &white.
Suitable Surfaces where CS-3 can be used are Brick Masonry, Concrete Surfaces ,Cement mortar Bed, Cement Plaster & on existing tiles (mix with CS-TA).

Advantages

  • Superior Quality
  • Can be used for walls & Floors
  • Easy to use with good trowel ability
  • High Bonding Strength
  • Long open time
  • Uses

    Designed for interior or exterior installation of ceramic tile and natural stone for walls and floors.

    Coverage

    One kg will cover approx 3sqft for a bed of 3 mm thickness.

    Packing

    25 kg BOPP Valve Type Bags

    Substrates

    1. Cement mortar bed
    2. Cement plaster
    3. Cement floor
    4. Cement terrazzo
    Coverage
    Trowel size Approx coverage
    1/4””*1/4″*1/4″(6*6*6mm)square notch 50-60 sq ft
    1/4°*3 /8″*1/4″ (6*9.5*6mm)square notch 30-40 sq ft
    1/2″*1/2″*1/2″(13*13*13mm)square notch 20-24 sq ft
    • 50 to 60 sq ft for 20 kg using 6*6*6mm square notch-for ceramic tile
    • 30 to 40 sq ft for 20 kg using 6*9.5*6mm square notch-for vitrified tile
    • 20 to 24 sq ft for 20 kg using 13*13*13mm square notch-for stones& larger sized tile
    Technical data and application properties at 73°F(23°C) and 50% relative humidity
    • Shelf Life-1 year(if it is stored in cool, dry place in original pack)
    • Water demand-4.5 to 5 liters for 20 kg powder
    • Open time- Approximately 20 min
    • Adjustment time-Approximately 20 min
    • Pot life -Approximately 4 hours
    • Shear bond strength(28 days)- Minimum 300 PSI/2.06N/mm2
    • Compressive Strength(28 days)-Minimum 2900 PSI/20.68N/mm2
    • Time for light foot traffic- 6 hours
    • Time for normal foot traffic- 24 hours
    • Time for heavy foot traffic-72 hours
    • Time before grouting-24 hours

    Specification subject to change without pior notification and may not reflect immediately on TDS. values shown in the table depends on laboratory condition and best procedure used. Actual field performance may vary on site condition and method of installation used. Company is not liable if failed to produce mentioned result in the site.

    Installation Instructions

    Inquiries

    Call or Whatsapp